Einheitspreis: | 10500~38000 USD |
---|---|
Zahlungsart: | T/T,L/C,D/A,D/P,Western Union,OA |
Incoterm: | FOB |
Minimum der Bestellmenge: | 1 Set/Sets |
Lieferzeit: | 45 Tage |
Modell: Zt-003-13
Verzinktes Stahlprofil
Roll Formmaschine
Fertigungsprozess
Abwickeln → Material in Maschine einspeisen → Rollen formen → Messlänge → Schrittgeformt → Autom. Schneiden → Produkte erhaltenProduktionsparameter
Verarbeitungsmaterial: farbige Stahlplatte, verzinkte Platte oder Aluminiumplatte
Materialstärke: 0,3-1,2 mm
Materialbreite: 1220mm / 1200/1000/1250
Formungsgeschwindigkeit: 8-25m / min
Komponenten der Produktionslinie
Komponenten der Produktionslinie
No. |
Name |
Unit |
Qty |
1 |
Manual decoiler |
set |
1 |
2 |
Main forming machine |
set |
1 |
3 |
PLC control system |
set |
1 |
4 |
Hydraulic pump station |
set |
1 |
5 |
Post cut |
set |
1 |
6 |
Electric motor |
set |
1 |
7 |
Output table |
set |
1 |
No. |
Main parameter |
|
1 |
Length of the main part |
About8500х1650х1500mm |
2 |
Weight of main part |
About 5.5 t |
3 |
Voltage |
380V/50HZ3Phase (as customer`s request) |
4 |
Roller fixer |
Middle plate welded |
5 |
Frame |
350 H steel welded |
6 |
Frame thickness |
16mm |
7 |
Drive mode |
Chain |
8 |
Material of rollers |
45# steel, surface hard chromium plating. |
9 |
Material of shafts |
45# steel |
10 |
Diameter of shafts |
Φ80mm |
11 |
Number of rollers |
15 rollers |
14 |
Main power |
5.5kw |
Machine Description |
Qty |
Delivery time |
Container Type |
Price (FOB TIANJIN) |
Galvanized Steel Profile Roll Forming Machine |
1 SET |
45 working days after receiving deposit |
One 20GP |
Depend on the final products |
Remarks |
|
Payment terms |
30% T/T in advance and balance 70% after inspection confirmation before shipment. |
Delivery |
within 45 working days after receipt of deposit. |
Packing |
Nude packing with 1*20 container |
Warranty |
One year, and we will provide the technical support for the whole life. |
Installation |
1.Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary. 2. Need one technician 3. Training time: one week (contains the time of installation and adjustment) |
Produktgruppe : Dachbahn Roll Umformmaschine > Glasierten Fliesen und Ridge Cap Profiliermaschine